Publish the Phase 4.5 exit audit using the Phase 1 severity taxonomy — P0–P3 gap register, ADR fidelity table, and 8-point sign-off checklist with zero open P0s.
Milestone 4.5.D.4 — Gap Register & Sign-off
Status: Planned
Goal: Track D — Exit Gate
Phase: 4.5 — Intelligence Layer
Estimated effort: 1 day
Track: Track D — Exit Gate
Why This Milestone Exists
Produces the Phase 4.5 equivalent of the Phase 1 exit audit — the actual completion certificate with severity-tiered gap register, ADR fidelity table for ADRs 0045–0048, and track-by-track verification.
Sign-off Criteria
- Gap register published, zero open P0 gaps
- All 10 INT-4.5 cases pass with
-m integrationin CI intelligence-integrationCI check required onmain- Cross-tenant isolation (INT-4.5.9) independently re-verified
- Fingerprint/drift computation stays off proxy hot path (benchmark D.3)
- All Phase 1–4 regression suites still green
- Dashboard Playwright flow (D.2) green
current-state.mdxupdated to reflect completion
Orientation (indicative)
Named paths, package layouts, libraries, schemas, env vars, and commands anywhere on this page are rough sketches for orientation — inspiration and a baseline, not a required change list.
During implementation, expect to:
- open the live tree and follow existing patterns before inventing new ones
- research current constraints (latency, tenancy, deploy shape, libraries) more deeply than this page can
- advance the design beyond the sketch where measurement or code reality says so
- land work in different filenames, merged packages, deferred docs, or new surfaces when the situation calls for it
Prefer outcomes over matching any particular file tree or command sequence.
Areas that may be involved (situational — not a checklist):
- Evaluation / benchmarks
- Fingerprinting / drift
- Directive regression / promotion
Success signals
Outcome-oriented signals that the milestone is in good shape. Exact filenames, package layouts, and commands may differ from any sketches above.
- Gap register published with Phase 1's severity table format
- ADR fidelity table for ADRs 0045–0048
- Zero open P0 gaps at sign-off
-
current-state.mdxupdated
Prerequisites
- Milestones 4.5.D.1–4.5.D.3 complete
Last updated on